Home > Multimedia > References > Galvanization
Raon L’Etape walkway
ACHIEVEMENT : Raon L’Etape walkway
Details of construction site
- As part of the development project for the banks of the Meurthe, the contractors have devised a metal walkway over 100 metres in length, the creation of which has been entrusted to VIRY. VIRY has chosen GALVA ECLAIR for the galvanizing process due to the high level of finish required, as well as the dimensions of its zinc bath (over 16 metres in length)..
- Client : Ville de Raon l’Etape
- Architect : Atelier Cité Architecture
- Metal manufacturer : Viry France (groupe FAYAT)
- Galvanization : GALVA ECLAIR
Our other photo reports in galvanization
CHOOSE A PLANT